WEBLog - Check PowerControl

How to test the PowerControl control on the WEB'log without radio ripple control receiver:


  1. The control levels must already have been configured under Admin Measurement -> Power Control -> General Configuration.
  2. The PowerControl control must be activated, the control type set to P (DI) internal (when used with PCU + to P (DI)).





  3. Pull out the connection block of the digital channels.
  4. Depending on the control level, bridge the channel between + and -
  5. The control level is now switched and the inverters have to be adjusted accordingly - the control level is also shown in the display

Note that there are 24 V on the DI channels at the + pin.