How to test the PowerControl control on the WEB'log without radio ripple control receiver:
- The control levels must already have been configured under Admin Measurement -> Power Control -> General Configuration.
-
The PowerControl control must be activated, the control type set to P (DI) internal (when used with PCU + to P (DI)).
- Pull out the connection block of the digital channels.
- Depending on the control level, bridge the channel between + and -
- The control level is now switched and the inverters have to be adjusted accordingly - the control level is also shown in the display
Note that there are 24 V on the DI channels at the + pin.